Certification Manual
- 9 -
ii. Introduction
Alliance Monitoring Technologies is renowned in the Midwest region’s
Long Term Health Care industry for its service in meeting the needs of its
customers. This reputation has been the result of ethical work practices,
fulfilling obligations promptly, listening to customers, anticipating their
needs, and responding rapidly when troubles arise with the system for
whatever reason. It is much easier to destroy a reputation than to build or
even repair one. Remember, you only get one chance to make a first
impression. Making continued good impressions is the mark of a true
professional.
This manual and certification process has been developed to provide
Alliance Installers with a systematic approach to each job. “Stay with the
Plan!” There are two reasons for following the drawings and work
sequences given by the Alliance Project Manager.
The first reason is stated as one of the Goals and Objectives of this
manual: Namely to bring about uniformity and consistency in all of the
AllCall© installations. This policy ensure that any AllCall© certified
Technician can work on any AllCall© system in both new installations and
service work when needed. Under these circumstances, Alliance will
provide the necessary documentation for the installation. Situations may
arise due to changes in blue prints, structural considerations, or even
requests made by the Construction Supervisor or Administration of the
facility. If this happens, contact the Alliance Project Manager to notify him.
Drawings, etc. will need to be changed for future filing. Otherwise, “Stay
with the Plan!”
The second reason is to be able to work smarter and more efficiently.
The Project Manager has made out the drawings, parts lists, and work
sequences to eliminate extra work. It is much better to pull wire in the attic
once than have to go back and pull some more again later. “Stay with the
Plan!”
Komentáře k této Příručce